Education Photography for ACE Schools

ACE Academy Schools

40kW solar PV installation across three schools, generating 40,200kWh per year, cutting 22,900kg CO₂ and delivering a 17% annual return.

  • Energy Generated: 40,200 kWh/ year
  • Carbon Reduction: 22,900kg/year
  • Annual ROI: 17%
View Project
Exeter College Building

Exeter College

18kWp solar thermal system, reducing carbon emissions by 11,500kg per year and cutting energy costs with a fast, low-disruption installation.

  • Energy Generated: 20,381 kWh/ year
  • Carbon Reduction: 11,500kg/year
  • Annual ROI: 9%
View Project

Mabe Community Primary School

10 kWp solar PV installation that generates 8,740 kWh/year, reduces carbon emissions by 5 tonnes annually, and is an eco‑educational resource.

  • System Size: 10 kWp
  • Payback: 6.5 years
  • Annual ROI: 15.7%
View Project
Solar PV on university building

University of Exeter

We installed 370kW (1100 panels) across a diverse range of roofs in the spring of 2020, working through 3 named storms to deliver to scope, budget and on time without disruption to the University.

  • System Size: 370 kWp
  • Payback: 5 Years
  • Annual ROI: 21%
View Project